Offset: 0

Fill in the form and send it to us. We will contact you in the shortest time.

First name*
Second name*
E-mail*
Phone number*
Country
Company
ZIP code |City
Region

Message*



1
By pressing “Send”, I confirm that I agree to get the further information
form MKS Group of Companies via telephone and e-mail.
* required field


WE in the social networks

FACEBOOK
VK
YOUTUBE
GOOGLE+

INFORMATION ABOUT US

MKS Group of Companies presentation
Commercial offer
view    |    download view    |    download

Prospect of MKS Group of Companies
Commercial offer: equipment
Business proposal. Power production and distribution
Presentation video
Offer for foreign consumers

View the full list
Power plant data sheet
Name of the organization*
Region, city*
Contact person*
Tel./FAX*
E-mail*

Type of power plant
Type of generating unit:
Types of power plant performance:
Grid working modes:
Working schedule:

Organization’s power characteristics
Power supply system
Maximum capacity:*kW
Minimum capacity:kW
Voltage level:kV

Heat supply necessity:
Required heat capacity:kW
Temperature working schedule:°
Hot-water supply:
Heating:

Cold-water supply necessity:
Required capacity:kW
Temperature working schedule:°

Steam necessity:
Steamfeed rate:t/h (ton per hour)
Steam temperature:°

Gas supply system
Gas pipe existence:
Gas feed rate:t/h (ton per hour)
Gas consumption reserve:

Additional information on the project:
(*) Is a mark showing the fields obligatory to be filled
under reconstruction
Energy power for business
         



Mini-CHP for GOK (mining and refining plant)
Chelyabinskaya region

4 MW



Mini-CHP for GOK (mining and refining plant)
Chelyabinskaya region

2.4 MW



Mini-CHP for a retail network
Yesaulka

2.6 MW



Energy center for an enrichment factory
Plast

16 MW



Mini-CHP for a retail network
Tambov

1.2 MW



Energy center for the university
Chelyabinsk

2.4 MW



Energy center for a Oil-Chemical plant
Tambov

6 MW



Energy center for warehouses complex
Pervouralsk

2.5 MW



Energy center for a center of logistics
Yekaterinburg

2.4 MW

ctivities of MKS Group of Companies

MKS Group of Companies is one of the leaders in the sphere of power, which can be proved by the widest geographical presence in the reference-list. Over 30 mini-CHP plants were built in 10 years on the territory of Chelyabinskaya region, Sverdlovskaya region, Kurganskaya region, Tambovskaya region, Krasnodarskyi krai, Khanty-Mansiyskom Autonomous district and other regions. The total capacity of launched CHP plants exceeds 150 MW. JSC Uzhuralzoloto GC, OJSC Pigment, retailer Magnit (ZAO Tander), OJSC Geotron, national research center SUSU and other organizations and companies of Russia have committed power facilities to MKS Group of Companies LLC.

Our objects
Reference-list
Location Object Energy center capacity Engine brand Realization Project Parallel operation Delivery Building and core work Setup Others
Electric power (Mwh) Heat power (Gcal)
1 Chelyabinsk Warehouse 200 300 YAMZ Machine room + + + + +
2 Chelyabinsk Office center 400 600 YAMZ Machine room + + +
3 Chelyabinsk Plant of drinks 400 600 YAMZ Container + + +
4 The Chelyabinsk Region Warehouse complex 2 600 5 200 Perkins Machine room + + + + +
5 Chelyabinsk Furniture factory 400 500 MAN Machine room + + + +
6 Chelyabinsk University 2 400 3 200 Perkins Machine room + + + + + The first order realization
7 Chelyabinsk Pipe plant 12 000 14 000 Perkins Machine room + Project only
8 Chelyabinsk Pipe plant 200 200 MAN Container + + + +
9 Chelyabinsk Auto center 1 200 3 600 Perkins Machine room + + + + + The first order realization
10 Chelyabinsk Office center 1 800 2 400 Perkins Machine room +
11 The Chelyabinsk Region Warehouse complex 4 000 6 000 Perkins Machine room + Project only
12 Chelyabinsk Production center 300 400 MAN Machine room + + + + +
13 Khanty-Mansiysk Autonomous District Small town 600 600 Tedom Container + + + + +
14 Chelyabinsk University 1 000 2 000 Capstone Machine room + + + + +
15 Tambov Warehouse complex 1 200 2 000 MAN Machine room + + + + +
16 Tyumen Business center 2 400 6 400 Perkins Machine room + + + + + Absorption refrigerating machine is installed, the first order
17 Yekaterinburg Trade center 3 000 4 400 MWM Machine room + + + +
18 Chelyabinsk Business center 1 800 Guascor Machine room +
19 Yekaterinburg Trade center 1 200 1 600 Perkins Machine room + +
20 The Sverdlovsk Region Bypass factory 3 600 3 600 MWM Machine room +
21 Kurgan Elevator 400 500 Perkins Container +
22 The Chelyabinsk Region Mining and beneficiation complex 2 000 CaterPillar Machine room + + + +
23 The Sverdlovsk Region Factory 600 800 MWM Machine room + + + + +
24 Chelyabinsk Glass plant 1 200 1 200 CaterPillar Container + +
25 Chelyabinsk Mining and beneficiation complex 20 000 20 000 CaterPillar Container + + + +
26 The Chelyabinsk Region University 16 000 24 000 MWM Machine room + + + +
27 The Sverdlovsk Region Manufactory 2 400 2 400 MWM Container + +
28 Yekaterinburg Manufactory 2 400 2 400 MWM Container + +
29 The Sverdlovsk Region Warehouse complex 3 400 11 400 MWM Machine room + + + + +
30 The Sverdlovsk Region Pipe plant 10 000 10 000 CaterPillar Machine room + +
31 Tambov Chemical plant 8 000 8 000 MWM Machine room + + + + +
32 Chelyabinsk Pipe plant 8 000 8 000 CaterPillar Container + + + Suspended
33 The Chelyabinsk Region Mining and beneficiation complex 27 000 27 000 MWM Machine room + + +
34 Chelyabinsk Glass plant 1 200 1 200 MWM Container + +
35 The Chelyabinsk Region Manufactory 4 000 4 000 CaterPillar Container + +
36 The Chelyabinsk Region Manufactory 2 400 2 400 MWM Container + + + +
37 Kurganskaya Oblast Manufactory 1 200 1 200 MWM Container + +
38 The Chelyabinsk Region Mining and refining plant 4 000 4 000 MWM Container + + + + +
39 The Chelyabinsk Region Chemical plant 2 400 2 400 MWM Container + + + +
40 The Chelyabinsk Region Mining and refining plant 4 300 4 300 MWM Container + + + + +
41 YNAO Enterprise 1 200 MWM Container +
TOTAL 162 800 192 800

Put a question

Name of organization*
Region, city*
Contact person*
Phone number*
E-mail*
Your question*


MKS Group of Companies has all competencies to construct complex energy centers. Organization structure of the company allows to providea full cycle of a project realization on turnkey basis including: design-engineering, equipment supply, construction assembling works, commissioning, warranty repairs and service, personnel training, consultancy service.