Energy centre for a Mining and Processing Plant
In 2016, the MKS Group of Companies within the framework of the general energy efficiency improvement program of the largest gold mining enterprise of Russia – Uzhuralzoloto Group of Companies, JSC – has launched a modular power plant with electric capacity of 4 MW in the Svetly village of the Plastovsky district of the Chelyabinsk region.
The power plant is built using a modular construction technology. This allowed to place the object in close proximity to the consumer. Two 2 MW MWM TCG 2020 V20 gas genset units were used as the main generating equipment.
NB: in 7 years of cooperation the MKS Group of Companies has put into operation 6 objects for JSC «UGC» with a total capacity of 54,4 MW.

«UGK» JSC
One of the largest gold mining companies in Russia in terms of production and reserves. All Group companies are located in the Russian Federation.

Module 2 MW
Compact and powerful solution with an efficient heat removal system.

Gas generator set MWM TCG 2020 V20
The optimized model is the most popular in the MWM TCG 2020 series to be used in the industrial sector.