Energy centre for a Mining and Processing Plant
In 2016, the MKS Group of Companies within the framework of the general energy efficiency improvement program of the largest gold mining enterprise of Russia – Uzhuralzoloto Group of Companies, JSC – has launched a modular power plant with electric capacity of 4 MW in the Svetly village of the Plastovsky district of the Chelyabinsk region.
The power plant is built using a modular construction technology. This allowed to place the object in close proximity to the consumer. Two 2 MW MWM TCG 2020 V20 gas genset units were used as the main generating equipment.
NB: in 7 years of cooperation the MKS Group of Companies has put into operation 6 objects for JSC «UGC» with a total capacity of 54,4 MW.
![«UGK» JSC «UGK» JSC](/storage/members/ugold.jpg)
«UGK» JSC
One of the largest gold mining companies in Russia in terms of production and reserves. All Group companies are located in the Russian Federation.
![Module 2 MW](/storage/products/t/2019/11/modul_2m0.png)
Module 2 MW
Compact and powerful solution with an efficient heat removal system.
![Gas generator set MWM TCG 2020 V20](/storage/products/t/2019/11/mwm_tcg_2020_v20.png)
Gas generator set MWM TCG 2020 V20
The optimized model is the most popular in the MWM TCG 2020 series to be used in the industrial sector.